Earthworks for the New Sorting Center of Vanheede Environmental Logistics
Challenges and Objectives
Alheembouw, commissioned by Vanheede Environmental Logistics, approached Verhelst Aannemingen for the earthworks of the new sorting center. The site was located at the E403, near the Roeselare-Izegem exit. The main objective was to make the site ready for construction through land elevation and soil stabilization, achieving the desired load-bearing capacity. Additionally, the construction site needed to be equipped with a gravel cushion to facilitate the pile foundations and the further construction of the building.
html
Our Execution
First, we raised the ground under the building and carried out stabilization work to create a solid foundation. In addition, we constructed a site track with concrete debris, creating an efficient and safe working environment.
We are currently performing the detailed excavation for the foundation piers of the new construction project. These precise excavation activities ensure that the foundations can be placed at the correct depth and location.
Special Attention Points
One of the most important focus points during this project was sorting the different soil codes, taking into account possible contamination. To make this process efficient and accurate, we used advanced GPS-controlled cranes. This technology enabled us to excavate and sort the soil layers in a correct way, allowing potential contamination to be identified and addressed.
Project in Numbers
- Total area of the site: 55,500 m²
- Total ground elevation: 20,000 m³
- Total excavation: 7,000 m³
- Equipment used: 2 cranes, 1 bulldozer, 1 roller, 1 spreader (all GPS-controlled), 1 tractor with mill